Staples Center, Los Angeles, USA

This ultramodern sports arena holds up to 22,000 spectators and will host two excellent teams: the Los Angeles Kings (ice hockey) and the L.A. Lakers (basketball).

The shear walls reach a maximum height of 37 m. For the loading zones in the lower level a larger column spacing was necessary so the lower level slab was post-tensioned with DYWIDAG Multistrand Tendons type MA 19 and 27-0.6" to reduce plate bending.

The flat slab post-tensioning of the upper levels was done using unbonded DYWIDAG Monostrand Tendons 0.5".

Owner

LA Arena Development Company, LLC

General Contractor

PCL Construction Services, Inc.

Architect

NBBJ Sports and Entertainment

Consulting Engineer

John A. Martin and Associates, Los Angeles, CA

Precast Contractor

ATC Curd Company


DSI Services

DYWIDAG Form Ties, DYWIDAG Bar Tendons as temporary tie backs, 16 tons of DYWIDAG Multistrand Tendons Type MA 19 and 27-0.6"; 55 tons of unbonded DYWIDAG Monostrand Tendons 0.5"; Installation, stressing and grouting of tendons.